ROBINSPECT
PlatformAboutWatchTrysimUTFAQContactMeet usSend us your partCAD file or the physical part, either works.
Watch · lab demo · 7 min 35

From 3D scan
to contact UT.

The inspection workflow on a welded industrial part: geometry, trajectory, robot setup, path check, then contact UT acquisition. Pause, scrub, jump to a chapter. Phased array ultrasonic testing (PAUT) and total focusing method (TFM): demonstrated on real hardware — not shown in this video.

3D scan0:00 – 0:30
0:00 / 7:35

What the montage shows

ROBINSPECT is a vendor-agnostic robotic NDT platform: a 6-axis robot, advanced ultrasonics and a repeatable path on complex geometry. What the video shows is contact UT on the filmed cell. PAUT / TFM are part of the integration stack and demonstrated on real hardware — not shown in this footage.

  1. 0:00 – 0:30 · 3D scan. Point cloud of the part, then the mesh used for path planning.
  2. 0:30 – 1:22 · Trajectory. Tool path generated on the surface, normal to the weld.
  3. 1:23 – 5:04 · Robot setup. Cell, coupling, probe on the part — the slow, real preparation.
  4. 5:04 – 6:03 · Path quality. Check that the TCP (tool center point) follows the weld before acquisition.
  5. 6:03 – 7:12 · Contact UT. Synchronized contact UT recording along the trajectory. PAUT and TFM: demonstrated on real hardware, not shown in this clip.

Times are those of the part in the video. About 30 minutes for the full contact-UT cycle, measured on the filmed part only. Not a guaranteed turnaround, and not a figure for PAUT or TFM. Contact-UT acquisition is under a minute on the filmed coupon — not PAUT/TFM, and not a long part. About 30 seconds of 3D scan on the filmed part; on a production part, expect a few minutes. Trajectory generation: a few seconds. UT expertise stays critical behind the cell.

Send us your partCAD file or the physical part, either works. Discuss a case